Build and test your canal lock

Install gates and water passages. Choose your chamber size and test whether the boat can complete the change in height.

Nallo’s guide for parents

Ready for an upward passageModel time · 0 s
Closed
Closed
Tap gates and boat in the scene. Drag the yellow valve handles or use the labelled sliders. The yellow button also guides you through the test without dragging.

Move the boat into the chamber. What needs closing next?

Predict what will happenWhat lifts the boat?

Discuss your prediction before testing.

Show measurements
Chamber water level1.60 m
Water from the upper canal0 m³
Water into the lower canal0 m³
Boat draught—
Current flow rate—
Look closely

What changes in this test?

Watch the water and the boat. Discuss the explanation after observing.

Explore further together

The boat always floats on the water. What lifts it?

Explanation guide for parents and model limits

How you can explain it: “The boat floats on the water. As the chamber water rises, the boat rises too. When the water falls, the boat moves down with it. The gate is simply a door to the other canal.”

Conversation prompt: “If we open the valve only a little, will less water enter in the end, or will it just take longer?” Compare the same lift and change only the opening.

Your plan sets the floor area and height difference. Water needed = chamber length × chamber width × lift height. A 10 × 4 m chamber with a 3 m lift needs 120 m³. A smaller opening takes longer but does not save water when starting and finishing levels are unchanged.

Flow rate is approximately proportional to the square root of the difference in water levels. Large canal sections keep their levels while water is taken from them or flows into them. With unchanged loading, the floating boat displaces a constant volume of water.

Interlocks belong to this learning simulation. Real locks may operate differently. We do not model swirling water or flow forces on the boat. Filling times are model values.

How locks work · Parks Canada · Flow model · USBR

BUILD 21 · 12 LABS · 12 OCT 2026